/
V4 Installation Requirements

V4 Installation Requirements

Installation Requirements

Requirements

 

Requirements

 

Mobile phone/tablet or laptop

A suitable Apple (iOS 10 or higher) or Android (Android 5 or higher) mobile phone/tablet

Blindsight account

With sufficient permissions to access the Blindsight unit being installed

Connectivity

4G signal. (Not required for normal Blindsight operation)

Machine allocation

Installation for one person takes around 4 hours (not including plumbing plant power)

General Requirements

  • Ensure that there is sufficient sensor cable length before mounting the Blindsight Processing Unit (BPU) and sensors.

  • Do not install Blindsight or route cables near hot areas, such as the exhaust and engine bay.

  • Do not install Blindsight near strong wireless transmitters that may interfere with wireless communications.

Component

Power

(Watts)

Fuse

** MM

Industry Equivalent

Conductor No/Dia

(mm)

Nominal Area

(Twin Core mm²)

Voltage

(V)

BPU

Max 60W

Avg 25W

15A

4

23/0.32

2.00

12 – 24

Final power draw is dependent on devices connected to output ports.

  • Fuses and twin core cable is included with the Blindsight kit

  • Power to be drawn directly from main battery supply

  • Alert trigger draws only a small load (<5mA)

  • All connections are broken out to Deutsch connectors

  • In-cab alert receives power via the BPU

In-cab alert

BPU

 

 

 

Specifications are minimum requirements and should be verified by a qualified auto electrician

Related content